Monday, August 30, 2010

Working on the patio at BSB.

The bars around the perimeter are to "raise" the walls when the patio wrap is not pulled down.


There now is a door on the front entrance.

And there's another door on the side.

With doors on the front and side, and with the stand-up bar repositioned as a separation in front of the bar ...

We hope to get permission to use the taps (obscured by the sign) during specially licensed parking lot events, like Fringe Fest this October.

No comments:

Post a Comment